新闻banner
Current location : HOME >> News >> Technical Information

Correct commissioning steps for hydraulic riveting machine

2022-01-06

1. Please unpack the outer package of the equipment, remove the waterproof plastic cover, and remove the four fixed nuts and screws. Place the device on the ground without anchor screws or cushions, as long as it is smooth and without shaking.

2. Add about 35 liters of No.30 hydraulic oil through the side hole of the tank, and the amount to be added shall be subject to the intermediate value of the oil temperature gauge. The power supply is 380 VOLTS, and the wiring is three-phase four-wire system. The connection mode has been marked on the wire head. A, B, and C are connected to the three-phase power supply. Wire E is connected to the neutral wire (not the ground wire). Otherwise, the device cannot work.

3, if the use of leakage protector, please choose four type. If the three-line leakage protector is used in the special riveting machine, the protector will start and power off because the zero line is not monitored by the leakage protector. At the base of the fuselage, find the terminal post marked with grounding mark and install the grounding cable.

4. Turn on the power switch and click the "oil pump start" switch to check whether the oil pump motor turns clockwise. Otherwise, please replace any two phases in the power line of "A", "B" and "C".

5, Suzhou pressure riveting machine commissioning steps: open the power switch, pull out the counter protection case, set the value of 9999, set the rate of ×1, and then press the RESET (RESET) key to remove the original memory inside the electric appliance, switch to manual, and then turn off the power switch.




How to solve the fault of anti pressure hand riveting machine

A. Check whether the lubricating oil in the pneumatic triplet oil cup is sufficient; otherwise, the oil cup should be filled.

B. Check whether each steam pipe and joint are firmly connected and whether there is air leakage.

C, check whether there is bonding phenomenon in the cavity of riveting head, if so, it should be cleaned up.

D. Add grease to the spherical pair.



标签

本文网址:/en/news/406.html

Recently Viewed: